Sale of F-35 Munitions notified
Announced 23/12/01Notification
- Announced
- 23/12/01
- Purchaser
- Republic of Korea
- Transmittal
- 23-81
- Estimated value
- $271,000,000
- Major defense equipment
- $209M
- Military department
- Air Force
The request as notified
The Government of the Republic of Korea has requested to buy thirty-nine (39) AIM-120C-8 Advanced Medium Range Air-to-Air Missiles (AMRAAM); two (2) AIM-120C-8 AMRAAM Guidance Sections; eighty-eight (88) KMU-556 Tail Kits for the GBU-31v1 Joint Direct-Attack Munition (JDAM); eighty-six (86) Mk-84 General Purpose (GP) 2000-lb bombs for the GBU-31v1 JDAM; seventy (70) KMU-557 Tail Kits for the GBU-31v3 JDAM; seventy (70) BLU-109C/B 2000-lb bombs for the GBU-31v3 JDAM; seventy-eight (78) KMU-572 Tail Kits for the GBU-54 Laser JDAM (LJDAM); two hundred sixty-nine (269) MAU-169 Computer Control Groups/Guidance Sections for the GBU-12 Paveway II; two hundred sixty-nine (269) MXU- 650 Air Foil Groups for the GBU-12 Paveway II; three hundred forty-two (342) Mk-82 500-lb GP bombs for the GBU-12 Paveway II or GBU-54 LJDAM; twelve (12) Mk-82 inert bombs; thirty-five (35) GBU-39 Small Diameter Bomb-Increment 1 (SDB-I) All-Up-Rounds (AUR) with containers; and one hundred eighteen (118) GBU-53 Small Diameter Bomb-Increment 2 (SDB-II) AURs. Also included are AIM-120 control section spares and containers; DSU-38 Laser Illuminated Target Detectors; SDB-I Tactical Training Rounds and carriage systems; SDB-II Practical Explosive Ordnance Disposal Trainers (PEST) and Weapon Load Crew Trainer (WLCT) units; FMU-139 fuzes; Common Munitions Built-in-Test (BIT)/Reprogramming Equipment (CMBRE); ADU-891 adapter group computer test sets; Mk-84 practice bombs and other training bombs/components; munitions support and support equipment including propellant and explosive charges; classified software delivery and support; spare parts, consumables, and accessories, and repair and return support; major modifications, maintenance, and maintenance support; transportation and airlift support; classified/unclassified publications and technical documentation; personnel training and training equipment; contractor logistics support (CLS); studies and surveys; U.S. Government and contractor engineering, technical and logistics support services; and other related elements of logistical and program support. The estimated total cost is $271 million.
The contractor sentence as notified
Lockheed Martin Corporation, Ocala, FL; Raytheon Missiles and Defense, Tucson, AZ; and the Boeing Company, Huntsville, AL
Members who traded a contractor · ±30 days
Trades dated within 30 days either side of 23/12/01, from House reports.
No member traded a contractor's stock in this window.